The overall relocationof The FAW Tooling Die Manufacturing Co., LTD.., including a 3 phases project which are the first phase relocation of Jier double acting 1300 tons (1) + double 400 tons (3); second ohase relocationof Jier 800 tons of 1.24; the third phase relocation forging Double Action Hydraulic Press 2000 tons (1) + 1000 tons (3),concerned about all the electronic control, working table, lubrication, gas path modification, main drive overhaul of the mechanical press.
relocation on spot
搬迁现场
after relocation
电控调试