Yizheng Shen Wei stamping A line consists of the J47-1250/2000 (1 units), JA39-1000 (4 units) and 2400 tons of tons of hydraulic pressure machine, which needed moving to Yizheng to the mass industrial park from an old plant. The relocation and reconstruction concerned all electric control, lubrication, gas road, working platform, protection and an installation of 200 tons of air cushion (5), the replacement of 160 tons of air cushion (5 units), as well ads the add-on of the robot multi station system to 2400 tons of double action hydraulic machine.
我公司总经理和瑞林先生致词
我公司销售副总刘吉辉先生(左)在仪式现场
完工仪式现场
完工仪式合影
参观搬迁后的冲压线
参观搬迁后的冲压线
搬迁后的冲压线